LNG Station for Boat
Back to previous pageLNG Station for Boat
Referential Image
Referential Image
LNG skid and offloading skid for boat
Referential Image
LNG skid and offloading skid for boat
- Installed mass meter with skid
- Use vacuum liquild pipe
- Optimized pipline design
- The connection is manily by welding,some by flange
Key technology
Referential Image
Referential Image
Key technology
- Long distance boat-shore connection,adapt complicated water status
- Barge LNG station use pipe gallery+flexible design method, the offloading distance can reach to 150 meters.
Offloading Skid
Referential Image
Offloading Skid
system configure 2 pumps,the output pipeline use vacuum pipe with vacuum degree less than 5 × 10-3Pa to avoid cool loss. the LNG trail offloading ablity can reach to 30m3/h, can offload at same time by one pump trail or two pump two trails, also can offload by self-supercharge.